Startup Assistance add-on: Interlayer Rack The Interlayer rack for the Palletizing Solution requires a pre-qualification by the Robotiq Service team to validate the feasibility considering the layout, robot reach, required cycle time and end of arm tooling. Included: - 1 x Standard interlayer rack - 1 x Stacklight to indicate fill status - 1 x day on-site for setup and programming - Layout design assistance - Pre-installation call with Service team member (requires COA-OPT-APP) **PLAN FOR 8 WEEKS MINIMUM BETWEEN THE ORDER AND INSTALLATION**




